LIGHT STEEL FRAMING PRODUCTS

LIGHT STEEL FRAMING PRODUCTS

 IN-STOCK PRODUCTS

Available for fast delivery across Perth

ProductSizeBMTLength
Furring Channel (FC)16×380.503.6m
Top Cross Rail (TCR)25×210.753.6m
Steel Stud64mm0.503.6m
Steel Track64mm0.503.0m

✔ Same-day / next-day delivery
✔ Competitive pricing on all stocked items
✔ Ideal for ceiling fixers and partition installers

FULL PRODUCT RANGE

Local stock + partner supply + factory manufacturing

We supply a complete range of light steel framing, ceiling accessories and suspension systems.
Some models are available locally, while others can be sourced through partner networks or manufactured to order.


Steel Stud & Track

Widths: 51 / 64 / 70 / 76 / 92 / 150 mm
BMT Options: 0.42 / 0.50 / 0.55 / 0.60 / 0.75 / 1.00
Lengths: 2.4m / 2.7m / 3.0m / 3.6m / 4.2m / 4.8m / Custom available

Applications: Internal partitions, commercial fit-outs, residential framing.


Furring Channel (FC)

Sizes: 16×38, 28×38, Custom
BMT Options: 0.42 / 0.50 / 0.55
Lengths: 3.0m / 3.6m / 4.2m


Top Cross Rail (TCR)

Size: 25×21
BMT Options: 0.55 / 0.60 / 0.75
Lengths: 3.0m / 3.6m / 4.2m


SUPPLY OPTIONS & LEAD TIME

We offer flexible supply solutions to suit different project timelines, budgets and order sizes.


1. Perth Warehouse Stock (Fastest Delivery)

  • Same-day / next-day delivery

  • Best for small to medium jobs

  • Highest stock reliability


2. Partner Stock (Additional Range — Clips & Rod)

  • 2–3 day lead time

  • Wide range of ceiling clips and suspension rods

  • Extra quantities of studs & tracks available


3. Factory Production Orders (Best Pricing for Large Volumes)

  • Full size range, BMT options and custom lengths

  • Ideal for commercial and project-based orders

  • Typical lead time: 3–5 weeks


Why Choose JXM?

✔ Lowest price guarantee — we beat any invoice by 5%
✔ Reliable supply chain with multiple sourcing options
✔ High-quality framing materials meeting AU standards
✔ Fast communication and local Perth support
✔ Perfect for contractors, builders and ceiling teams